NEW MANILA INTERNATIONAL AIRPORT
Bulacan, Philippines
▪️USD $14 Billion
▪️200 Million Per year
▪️4 to 6 Runways
The Airport is now underconstruction on a 2,500-hectare (6,200-acre) coastal property as part of an envisioned 12,000-hectare (30,000-acre) township that features a residential zone, government center, seaport and an industrial zone.
The Airport will feature at least 4 runways, expandable to 6. It will have a capacity of 200 million passengers per year when fully built, which is about six times larger than the current capacity of NAIA.
The first phase of the project will include two of the four runways.
It will also be connected to Metro Manila by an airport toll road with connections to the North Luzon Expressway and Radial Road 10. The airport will also be connected by rail to the MRT Line 7 through the MRT 7 Airport Express project.
[Bild: https://up.picr.de/42893977jl.jpg]
Bulacan, Philippines
▪️USD $14 Billion
▪️200 Million Per year
▪️4 to 6 Runways
The Airport is now underconstruction on a 2,500-hectare (6,200-acre) coastal property as part of an envisioned 12,000-hectare (30,000-acre) township that features a residential zone, government center, seaport and an industrial zone.
The Airport will feature at least 4 runways, expandable to 6. It will have a capacity of 200 million passengers per year when fully built, which is about six times larger than the current capacity of NAIA.
The first phase of the project will include two of the four runways.
It will also be connected to Metro Manila by an airport toll road with connections to the North Luzon Expressway and Radial Road 10. The airport will also be connected by rail to the MRT Line 7 through the MRT 7 Airport Express project.
[Bild: https://up.picr.de/42893977jl.jpg]